As a licensed IDNO, we offer a faster, often more cost-effective alternative to the local Distribution Network Operator (DNO). We meet the same standards, follow the same rules, and connect to the same grid — but we work harder to make the process simple.

We connect the projects driving Britain's net-zero future — both the generation that's coming online, and the demand it's there to serve.
The DNO route is often slower than the project needs. We move at developer pace — faster quotes, faster design, faster energisation.
Direct access to engineers and project managers who know your project, not call centres and ticket numbers.
We pay competitive Asset Values for the networks we adopt, releasing capital back into your project at the point it's most useful.

If your power supply is cut off, you can report it by calling our free 24-hour helpline: 0151 601 1911.
Whether you're at concept stage or ready to energise, we'll give you a straight answer fast. Send us the basics — location, capacity, project type — and we'll come back with a clear proposal.